Getting the recycled fir flooring laid, cabinets set in place and shelves built happened just days before the floor was sanded in a huge push to get Lois semi-functioning in her home again. In the meantime, her furniture is piled in the garage and her bedroom, outside, and where ever a space was available so the floors could be completely empty for refinishing.

Just like a jigsaw puzzle trying to get all the pieces to fit perfectly.

The wood for the beam and shelves is recycled.
No comments:
Post a Comment