Saturday, April 17, 2010

Eckert Lyon Week 1


Above-two happy hardworking clients leveling low spots in the temperary law (holding planting before trees and shrubs) near the driveway with organic material from the property.



Above-final raking of 'intuitive depression'-our solution for water control by garage. Below-some of the smaller rocks that will trim the stream and ponds.





Above-scraping the top soil where we need to excavate.
Below-A test hole in the pond. Indeed the ground is saturated with a liquefied layer about 30" below the ground. Within minutes it began puddling and the side of the hole began collapsing less than an hour later.






Above-Josh, documenting our process on video and well camouflaged, sets up his time lapse shot.



Above-Some of the equipment needed to 'do it right'
2 Below-Travis and josh horsing around.





3 Steps to a pond-Below starting at top
-The small upper pond excavated.
-Rock awaits placement of liner for upper pond while Joe and Josh stretch the giant inter tube made by Firestone over the underlayment in the hole.

-Upper pond finished
(previous project!)